COMPLETED PROJECTS:

LET DATE: Jan 2007
HIGHWAY: SP 482 - LET STATUS: Actual
GUIDE SIGN REFURBISING
FROM SH 183 to LP 12 - 1.8 miles
ESTIMATE: $37,111
ACTUAL: $32,886
Underbudget: $4,225

LET DATE: Jan 2007
HIGHWAY: SP 348 - LET STATUS: Actual
GUIDE SIGN REFURBISHING
FROM SH 114 to IH 35E - 3.1 miles
ESTIMATE: $32,679
ACTUAL: $30,384
Underbudget: $2,334

LET DATE: Jan 2007
HIGHWAY: LP 12 - LET STATUS: Actual
GUIDE SIGN REFURBISHING
FROM DUNCANVILLE ROAD TO IH 35E - 11.5 miles
ESTIMATE: $345,646
ACTUAL: $345,247
Underbudget: $399

LET DATE: Sept 2007
HIGHWAY: VA - LET STATUS - Actual
PAVEMENT MARKINGS VARIOUS ROADWAYS - ON SYSTEM IN NE DALLAS COUNTY TO ROCKWALL CO -NEAO - 86.1 miles
ESTIMATE: $3,326,534
ACTUAL: $1,868,636
Underbudget: $1,45l7,898

LET DATE: Sept 2007
HIGHWAY: VA - LET STATUS - Actual
PAVEMENT MARKINGS VARIOUS ROADWAYS - ON SYSTEM IN KAUFMAN COUNTY - 218.1 miles
ESTIMATE: $1,175,586
ACTUAL: $ 941,022
Underbudget: $823,436

LET DATE: Sept 2007
HIGHWAY: VA - LET STATUS - Actual
PAVEMENT MARKINGS VARIOUS ROADWAYS - ON SYSTEM IN ELLIS COUNTY - 99.9 Miles
ESTIMATE: $1,511,160
ACTUAL: $ 862,483
Underbudget: $648,677

LET DATE: Sept 2007
HIGHWAY: VA - LET STATUS - Actual
PAVEMENT MARKINGS VARIOUS ROADWAYS - ON SYSTEM IN CENTRAL DALLAS COUNTY - CDAO - 0.0 miles
ESTIMATE: $12,607
ACTUAL: $ 7,239
Underbudget: $5,368

LET DATE: Sept 2007
HIGHWAY: VA - LET STATUS - Actual
PAVEMENT MARKINGS VARIOUS ROADWAYS - ON SYSTEM IN SOUTHEAST DALLAS COUNTY - SEAO - 54.8 miles
ESTIMATE: $3,155,204
ACTUAL: $2,059,099
Underbudget: $1,096,105

LET DATE: Sept 2007
HIGHWAY: VA - LET STATUS - Actual
PAVEMENT MARKINGS VARIOUS ROADWAYS - ON SYSTEM IN SOUTHWEST DALLAS COUNTY - SWAO - 6.8 miles
ESTIMATE: $296,837
ACTUAL: $255,888
Underbudget: $40,949

LET DATE: Sept 2007
HIGHWAY: VA - LET STATUS - Actual
PAVEMENT MARKINGS VARIOUS ROADWAYS - ON SYSTEM IN NORTHWEST DALLAS COUNTY - NWAO - 0.0 miles
ESTIMATE: $7,327
ACTUAL: $4,319
Underbudget: $3.008

HIGHWAY: CS WIDEN 2 LANE FACILITY TO 4 LANE FACILITY ON SAMUEL BOULEVARD FROM IH 30 TO BUCKNER BLVD (NEAR CITY OF MESQUITE) - 2.5 miles
ESTIMATE: $20,155,730
ACTUAL: $17,789,497
Underbudget: $2,366,233


LET DATE: OCT 2006
HIGHWAY: SP 366 - Let Status: Actual
CONSTRUCT NEW 6 LANE BRIDGE OVER TRINITY RIVER AT TRINITY RIVER, WEST RIVER LEVEE, TO EAST TRINITY RIVER LEVEE - .04 miles
ESTIMATE: $64,004,883
ACTUAL: $69,674,804
COST OVERRUN: $5,669,921

LET DATE: OCT 2006
HIGHWAY: CS
WIDENING EXISTING FACILITY FROM 2 LANES TO 4 LANES DIVIDED
ON MOUNTAIN CRK PKWY FROM GRADY TO NIBLO RD EXIT TO SP 408 - 3.9 miles
ESTIMATE: $36,154,810
ACTUAL: $28,644,528
Underbudget: $7,510,282

LET DATE: Dec. 2006 - LET STATUS - Actual
HIGHWAY: VA ALTERNATIVE FUELS< CHG CONVERSION DALLAS LOVE FIELD 50 SHARED RIDE SHUTTLES AND 50 SHUTTLE BUSES 0.0 miles
ESTIMATE: $875,000
ACTUAL: $875,000
ON BUDGET

LET DATE: June 2007 - LET STATUS - Actual
REHABILITATE TRINITY RIVER BRIDGE (PHASE III)
IN DALLAS ON CORINTH STREET FROM 8TH STREET TO INDUSTRIAL BLVD - 0.6 Miles
ETIMATE: $2,511,921
ACTUAL: $1,865,330
Underbudget: $646,591

LET DATE: Nov 2006 - LET STATUS - Actual
HIGHWAY: CS DART LRT OVERPASS FROM SANTE FE TRAIL OVERPASS - HILL ST TO COMMERCE ON ABANDONED SANTA FE RR 0.0 miles
ESTIMATE: $1,000,000
ACTUAL: $ 329,712
Underbudget: $670,288

Of particular note in the Fort Worth District:
LET DATE: Jan 2007 LET STATUS: Actual
HIGHWAY: IH 30
TERMINATION OF HOV/MANAGED LANE AND TRANSITION MAIN LANES FROM BALLPARK WAY TO DALLAS COUNTY LINE - 3.6 miles
ESTIMATE $4,369,393
ACTUAL: $3,152,951

and in the Dallas District:
LET DATE: Jan 2007 LET STATUS: Actual
HIGHWAY: IH 30
CONSTRUCT MANAGED LANES FROM TARRANT COUNTY LINE TO EAST OF SYLVANA AVENUE - 13.0 Miles
ESTIMATE $3,982,127
ACTUAL: $3,095,784

IH 30 HOV MANAGED LANES TARRANT AND DALLAS COUNTIES:
UNDERBUDGET $2,102,785


UPCOMING:

LET DATE: July 2007 (FY 2007) contracts for the Dallas Region include:
HIGHWAY: SP 366 - Let Status: Approved
INSTALL SENSOR STATIONS WITH COMPRESSED CCT CAMERAS from IH 35E to US 75 (1.5 miles
Estimate: $964,178

LET DATE: July 2007
HIGHWAY - LP 12 - LET STATUS: Approved
REHABILITATION OF EXISTING ROADWAY
FROM PEMBERTON HILL ROAD TO US 175 - 2.0 miles
ESTIMATE: $2,893,706

LET DATE: Aug 2007
HIGHWAY: LP 12 - LET STATUS: Approved
INSTALL FREEWAY MANAGEMENT SYSTEM ON NAFTA INCIDENT BYPASS
FROM SPUR 408 TO SH 183 - 7.9 miles
ESTIMATE: $5,032,000

LET DATE: Aug 2007
HIGHWAY: SP 408 - LET STATUS: Approved
INSTALL EQUIPMENT IN THE ITS COMMUNICATION BUILDING
From IH 20 to LOOP 12 - 4.3 miles
ESTIMATE: $120,972

LET DATE: AUG. 2007
HIGHWAY: SH 121 - LET STATUS - Approved
CONSTRUCTION OF GRADE SEPARATIONS AT FREEPORT AND SANDY LAKE
FROM TARRANT COUNTY LINE TO DENTON CREEK - 1.7 miles
ESTIMATE: $26,306,924

LET DATE: Aug 2007
HIGHWAY: VA - LET STATUS - Approved
CONSTRUCTION OF LANCASTER VISITOR'S CENTER IN THE DOWNTOWN CITY OF LANCASTER - 0.0 Miles
ESTIMATE: $1,695,000

Fair Use

FAIR USE NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. Material from diverse and sometimes temporary sources is being made available in a permanent unified manner, as part of an effort to advance understanding of the social justice issues associated with eminent domain and the privatization of public infrastructure. It is believed that this is a 'fair use' of the information as allowed under section 107 of the US Copyright Law. In accordance with Title 17 USC Section 107, the site is maintained without profit for those who access it for research and educational purposes. For more information, see: http://www.law.cornell.edu/ To use material reproduced on this site for purposes that go beyond 'fair use', permission is required from the copyright owner indicated with a name and an Internet link at the end of each item. [NOTE: The text of this notice was lifted from CorridorNews.blogspot.com]

See ARCHIVE on side bar

Content is being archived weekly. Many pertinent articles regarding Transportation in the DFW Region are in the archives.

A government big enough to give you everything you want, is strong enough to take everything you have. - Thomas Jefferson

The Opnions On this Site are Diverse

DFW Regional Concerned Citizens attempts to examine issues from all directions. When a story says "By Faith Chatham" it contains my viewpoint. When it is by others, but posted by Faith Chatham, it is from someone else's viewpoint. When I discover contents which is on topic for this site, I frequently link to other sites. Usually those sites contain content which differs from my viewpoint (and frequently that of other members of DFW-RCC).