Showing posts with label Oscar Trevino. Show all posts
Showing posts with label Oscar Trevino. Show all posts

Monday, June 23, 2008

TXDOT Hearings on 820 Toll Roads July 1

Notice of a meeting July 1
The issue is not just tolls but letting a foreign country control Texas land in perpetuity.

Focus on Local Issue - *TOLL ROADS ACTION ALERT*
You might have seen the article in the Fort Worth Star-Telegram on Friday about the North Loop 820 expansion, and how it will be paid for through very expensive toll roads, to be constructed by CINTRA, Rick Perry's special-interest Spanish corporation that courted the Trans Texas Corridor. In a nutshell, Bud Kennedy is reporting that the proposed toll for EACH WAY in the new toll lanes will be $4.00 for a total of $8.00 roundtrip. Republican County Commissioner Gary Fickes is very much responsible for this situation as he was the one who led the cheerleading effort on the Regional Transit council to get this plan passed.

TXDOT is holding a Public Hearing in Richland Hills to get community input. Let's get out there and show them what kind of "input" we have for them.

Public Hearing for Loop 820 Toll Road
Tues., July 1, 6:30pm
Richland Hills Church of Christ
6300 North East Loop 820
Richland Hills, Texas

Click here for a map

Link to Star Telegram Article about 820 Toll Lanes

Link to TXDOT Public Hearing in Richland Hills

Link to Toll Tag Application

Bud Kennedy: Worst bottlenecks in North Texas? Right here in Tarrant
By Bud Kennedy - Fort Worth Star Telegram - June 20, 2008
We’re No. 1.

But not in a good way.

Northeast Loop 820 in Hurst is the worst bottleneck in all of North Texas, according to a new study that ranks the region’s roads among America’s most choked, behind only Los Angeles, New York, Chicago and Washington.

There’s more bad news.

Not only is the 820-Airport Freeway interchange the No. 1 bottleneck — worse than anyplace in Dallas— but the Loop 820 exits at Denton Highway and Rufe Snow Drive are Nos. 2 and 3.

Overall, Northeast Tarrant County drivers face worse traffic than anyone in Dallas or Houston, according to a study of truck GPS data compiled by INRIX Inc. of Seattle.

Only Austin — where Interstate 35 amounts to a 5-mile-long elevated parking lot — has a freeway as crowded as Loop 820, and that city’s traffic overall is nowhere near as bad as Fort Worth’s.

What’s more, the region’s No. 4 worst bottleneck is Interstate 35W north of downtown Fort Worth. It’s congested an average of 7 hours a day.

Basically, Houston and Dallas already fixed their roads. We’re waiting for state money.

I would like to assure you that every county and city official is working on the problem.

But I couldn’t find many of them yesterday. For all I know, they were stalled in traffic at Holiday Lane.

When North Richland Hills Mayor Oscar Trevino called back, he was weaving down neighborhood streets to escape U.S. 377.

He described Loop 820 as "just ugly."

"The people who have to drive that every day don’t say nice things," he said. "It’s bad for our city. Businesses want to come, but they see the traffic and say, 'Why would I get into this?’ "

County Judge Glen Whitley is very familiar with the time-waste potential of Loop 820. He lives in Hurst.

"It’s a big drawback to the whole county," he said. "The traffic north of Fort Worth is so unreliable that nobody can predict how long it’ll take to get to work."

There’s a solution in the making. But lots of Texans won’t like it.

Three Spanish-owned companies are in the running for a $1 billion contract to widen Loop 820 and operate two private toll lanes. The toll would be $4 each way.

The project is part of the North Tarrant Express, a new tollway network slow off the drawing board in Austin.

"We can’t get Austin to move forward," Whitley said. "It’s ridiculous that this is the last part of Loop 820 to be improved."

A public hearing July 1 at 7 p.m. at Richland Hills Church of Christ will give both residents and tollway-haters a chance to vent about both the slow plans and high tolls.

Terri Hall of San Antonio leads an anti-tollway group, Texans Uniting for Reform & Freedom (TURF). She said she opposes any private tollway.

"The bottom line is, this the most expensive way to expand that road," she said. "It means the highest possible cost to taxpayers and drivers, and hands over money to foreign companies. When the state has a record budget surplus, it’s hard to see how there’s not money for that road."

Call it the Billion-Dollar Bottleneck.

Tuesday, July 17, 2007

Regional Transportation Council's chairman slowing down to speed things up

By O.K. CARTER - Star-Telegram Staff Writer - Thu, Jul. 05, 2007
North Richland Hills Mayor Oscar Trevino is only 30 days into his role as chairman of the Regional Transportation Council, but he's already discovered that leading the council resembles herding whales: It takes a while, and some whales always wander off in new directions.

Last month's vote to recommend a builder and operator of a future Texas 121 toll road, for example, was 27-10 in favor of the North Texas Tollway Authority, with some of the 10 voicing adamant opposition. Regional transportation issues rarely achieve consensus because interests and needs are so varied.

The council, part of the North Central Texas Council of Governments, is the chief planning agent for future regional transportation needs: highway improvements, toll roads, regional passenger rail and the like. The regional council's 40 members include elected or appointed officials from 16 Metroplex counties, as well as representatives from transportation planners like The T or Dallas Area Rapid Transit. Nothing big in regional transit happens without the regional council's endorsement.

"The process of getting things done in regional transportation is miserably slow, like watching grass grow," the thrice-elected North Richland Hills mayor jokes. It helps that he's also a civil engineer and highway construction expert.

It's already obvious that Trevino's style is to speed up by slowing down, giving council members plenty of time to get their say. His first meeting ran almost four hours. It's a hypothesis that long meetings equal faster projects.

"Letting members have their say and having open civil discussions may result in meetings going a little long," Trevino concedes. "But when everybody can present positions and have them openly debated, even members that don't get things 100 percent their way will know that we hashed it out and gave them a fair shake."Trevino knows that at the same time, the clock is ticking on transportation issues and speeding up projects is crucial.

A recent census study revealed that the percentage of people commuting to work in a vehicle by themselves actually increased by 2 percent over the past five years. The population of the Metroplex is projected to increase 3.5 million over the next three decades.

"More cars and people add to pollution and congestion problems," he said.

Trevino's watch as council chairman did not begin on a cheerful note. A pitch to the Legislature to allow Metroplex residents to vote on a half-cent sales tax to fund regional passenger rail was essentially ignored.

"If transportation planning moves slow, the Legislature moves even slower," Trevino said. "If you want something done in one session, you have to introduce it an earlier session. Basically, all we're asking is that the Legislature allow voters here to make that call."

Without the tax, Trevino sees no way to fund regional rail, which is why one of the top two priorities of his council term will be to organize a more focused and determined legislative lobbying effort two years from now to get lawmakers to allow a vote on a tax.

The other priority? When he hands over his gavel to a new chairman in 11 months, Trevino would love it if the tollway authority had resolved not only the 121 issue, but had also established firm timetables for toll road projects, including a widening of Texas 360 in southeast Tarrant (Arlington/Mansfield), Texas 171 in north Fort Worth and north Tarrant County, and the Southwest Parkway. He'd also like the tollway authority to pick up the pace on a George Bush Freeway extension and the Dallas Trinity Parkway project.

"It's also obvious that [the Texas Department of Transportation] is going to have to recognize that it's going to have to take care of some mobility issues without assistance from tolls, including problems on I-35, Loop 820, S.H.183 and the downtown funnel," Trevino said, though with a proviso: He favors construction of toll-funded express lanes on 820.

That's much to do with less than a year to do it.

O.K. Carter's column appears Tuesdays and Thursdays.
Read more

Fair Use

FAIR USE NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. Material from diverse and sometimes temporary sources is being made available in a permanent unified manner, as part of an effort to advance understanding of the social justice issues associated with eminent domain and the privatization of public infrastructure. It is believed that this is a 'fair use' of the information as allowed under section 107 of the US Copyright Law. In accordance with Title 17 USC Section 107, the site is maintained without profit for those who access it for research and educational purposes. For more information, see: http://www.law.cornell.edu/ To use material reproduced on this site for purposes that go beyond 'fair use', permission is required from the copyright owner indicated with a name and an Internet link at the end of each item. [NOTE: The text of this notice was lifted from CorridorNews.blogspot.com]

See ARCHIVE on side bar

Content is being archived weekly. Many pertinent articles regarding Transportation in the DFW Region are in the archives.

A government big enough to give you everything you want, is strong enough to take everything you have. - Thomas Jefferson

The Opnions On this Site are Diverse

DFW Regional Concerned Citizens attempts to examine issues from all directions. When a story says "By Faith Chatham" it contains my viewpoint. When it is by others, but posted by Faith Chatham, it is from someone else's viewpoint. When I discover contents which is on topic for this site, I frequently link to other sites. Usually those sites contain content which differs from my viewpoint (and frequently that of other members of DFW-RCC).